Storage and transportation system start-up plan

2009-04-18View Original

Thread Content

How to write the start-up plan for the storage and transportation system? Thank you.
Reply #22009-04-18
Just write it according to the purging sequence when the device is started, the sequence of products produced and the process requirements.
Reply #32009-04-20
This problem is actually very difficult. There are many issues to consider, especially when it comes to public engineering design, which makes it even more difficult.
Reply #42009-04-20
First of all, you must clarify your design purpose. The start-up plan must include achieving the design purpose and testing it one by one. Test run each function to see if it can ultimately meet your operational requirements.
Reply #52009-04-21
The start-up plan is written based on the specific equipment and equipment.
Reply #62009-05-14
Please refer to the chemical industry large and medium-sized equipment commissioning work specifications (HGJ231-91)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.