HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

tower

2009-04-19View Original

Thread Content

How should control points be set during the tower manufacturing process? What kinds of problems are likely to occur during the on-site installation of equipment?
Reply #22009-04-19
Take a look at GB150-89 \"Steel Pressure Vessels\" and the \"Regulations on Safety Inspection of Pressure Vessels\".
Reply #32009-04-19
Pay special attention to the orientation of the pipe outlet and the dimensions of the supports, otherwise lifting issues may arise. If it is installed according to the orientation diagram, there will be no problems

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.