Could an expert please advise: what are the initial startup steps for a delayed coking unit?
Reply #22009-04-20
1. Comprehensive inspection of the device. 2. Commissioning of public works. 3. Device penetration and purging. 4. Device water flushing and water interconnection. 5. Testing of the pump. 6. Compressor trial operation. 7. Commissioning of the hydraulic coking removal system. 8. Heat the furnace for drying. 9. Pressure testing for airtightness and gas displacement of the device. 10. Diesel cold transport, hot transport. 11. Paraffin–residue operation started. 12. Commissioning of the cold coke system.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.