HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Shutdown plan

2009-04-21View Original

Thread Content

The unit consists of two parallel sections for regenerative catalytic cracking. The semi-regenerative slide valve and the external heat extraction slide valve are stuck and can only move within a range of 30–40%, unable to be closed. I would like to ask how to handle this situation in an emergency
Reply #22009-04-21
Every effort is made to stop its fluidization, such as turning off all the fluidization air, to ensure normal operation of the external heat extraction water supply

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.