HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Boiler drain

2009-06-01View Original

Thread Content

Under what circumstances is it necessary to drain water from the boiler? Is it before starting up the boiler and after shutting it down?
Reply #22011-01-28
This post was last edited by zgj2405 on 2011-1-28 at 13:01 – the drain system installed in the boiler superheater section. It is used quite often when starting boilers. The drain system for the “high-pressure heater” section of the boiler. High-temperature condensate is allowed to flow by gravity or pumped to the low-temperature economizer in order to recover energy. Surface blowdown system for the boiler.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.