Thread Content
This post was last edited by Instrument Worker on 2009-6-12 at 10:04. Dear fellow sailors, are you involved in the construction of new projects? If so, feel free to share it. Your feelings, the progress of the project – whatever you want to say and are able to say; there is no forced communication. A true friend afar is as near as one at home. . . I work in the coal chemical industry, focusing on the construction of ammonia synthesis plants; I am based in Kaiyang, Guizhou, where 50wt ammonia synthesis is carried out using the GSP gasification process. The project is under construction, but progress is slow; we’ve run into many non-technical issues, which is quite frustrating.
We are currently working on a project related to polysilicon; my role is mainly focused on the treatment of waste materials. However, there are no mature processes for waste treatment in this industry, so I am exploring various methods little by little, facing many difficulties along the way that I am striving to overcome. Additionally, due to the financial crisis, companies are encountering numerous challenges; we are doing our best, and I believe tomorrow will be better for us
Kaiyang? Wasn’t it already put into operation? . . . . .
500,000 tons of synthetic ammonia is probably the largest scale available at present. Yuntianhua seems to have such a facility; I’m not sure how well it’s being operated Our company is considering a capacity of 300,000 tons; for the gasification process, water-coal slurry is planned to be used, as we believe technologies like GSP are not yet mature in China.
3# wxla0 It has not been put into operation here.
The 200,000 tons per year reforming project in Dongying is under construction, and there are many similar projects being built.
Who knows when the next chemical industry revival will occur? Will our own project development be able to keep up?
This post was last edited by wonder_nj on 2009-7-9 20:22. It relates to the preliminary work for a project; I’ve never been involved in such preliminary tasks before, so there’s still a lot to learn!
Shaanxi Yanchang Petroleum is constructing facilities for 200,000 tons of acetic acid and 100,000 tons of methanol.
1# Instrument worker: I’m familiar with this project; it was invested in by Yankuang. The refrigeration system is an ammonia absorption-type refrigeration unit designed by a design institute, with a capacity of around 20 million kcal. Is Wang Yu’an specifically in charge of this project? It is said that with an investment of 5 billion, if things are done well, there should be good prospects. It’s not far from Zunyi.