Construction method for refractory castables on furnace roofs

2009-07-01View Original

Thread Content

Which construction method is better for furnace roof refractory castables (manual ramming, formwork casting, mechanical spraying, etc.)? What are the advantages and disadvantages of each?
Reply #22009-07-01
Generally, hand-pressed ones are more commonly used
Reply #32009-07-01
It is safer to start with manual ramming and formwork placement followed by pouring
Reply #42009-08-03
Generally, formwork is set up first, followed by the preparation of fire-resistant concrete, and finally pouring takes place
Reply #52009-08-03
It depends on how large the span is, I guess? For large spans, a forced mixer is required for mixing, followed by formwork placement and pouring; in addition, suspension fixtures must be installed for hanging.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.