This post was last edited by sunjl1981 on 2013-1-6 22:17 1. Project construction location issues (1) Choose the east, middle and lower reaches of the Yangtze River Basin, combine resource advantages with downstream chlorine and alkali consumption, and give full play to the advantages of waterway transportation; (2) The initial land area is calculated as 30 hectares, 600 * 500m ; 2. Product plan (1) 400,000 tons of caustic soda, including 250,000 tons of liquid alkali (32%) and 150,000 tons of solid alkali (can produce 48-50% liquid alkali at the same time) ; (2) 300,000 tons of hydrogen chloride (including high-purity hydrochloric acid furnace) ; (3) 100,000 tons of liquid chlorine, and a 100,000-ton liquid chlorine vaporization device is also considered to meet the requirements of high-purity chlorine gas users ; (4) Sodium hypochlorite, a by-product of light chlorine absorption, is designed as a qualified product and is temporarily calculated as 20,000 tons of output. ; 3. Basic process route (1) Start with raw salt, and consider adding brine at a ratio of 25%, based on the current mainstream brine electrolysis process design ; (2) Consider land and water transportation of raw materials and products ; 4. Investment and income (1) tentatively estimated at 1 billion ; (2) Income is not evaluated ; 5 Instructions (1) all roads lead to Roma. There is no perfect plan. Just grasp the theme and achieve the purpose of the activity. Please help us. (2) If there are no issues of principle, we hope to get the support and participation of sea friends to continue to move forward with this activity. # hcbbs
Although this is a virtual project, environmental protection still needs to be taken into consideration
Safety and occupational health should also be added. It is recommended that the Preparatory Office establish an HSE management department.
Basically agree, please continue to advance the project.
Should all the by-product hydrogen be chlorinated to make hydrochloric acid? Isn’t it a waste of chlorine? Haha, why not formulate downstream products of hydrogen? The added value of hydrochloric acid is relatively low.
Finished products: pvc, chlorine gas, waste products, sulfuric acid, etc. I am looking at dozens of project planning books.- -
Some opinions: 1. The land area is not enough. 30 hectares is almost what we often call 500 acres. The 500 acres of land must also reserve production expansion area, office area, living area, and other supporting areas. 30 hectares is not enough. It is estimated to be 60 to 100 hectares. 2. The total investment is not enough, 1 billion * * Bineng will build a PVC and caustic soda project with an annual output of 100,000 tons (including a self-owned power plant). Since it is a project, we must do it well and make it perfect so that future real-world projects can learn from us.