HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When digging a pit near a sulfuric acid storage tank, what is the minimum horizontal distance between the pit and the tank?

2009-07-28View Original

Thread Content

This post was last edited by Lai Lai on 2009-8-28 13:40. It is found that there is a sulfuric acid storage tank on the ground with a diameter of 16 meters and a height of about 12 meters. A pit needs to be dug near the storage tank with a depth of about 7 meters. What is the minimum horizontal distance between this pit and the storage tank?
Reply #22009-07-31
No one has answered for so long. I consulted a civil engineering expert and they said that the distance between the pit you dig and the foundation of the storage tank should be at least the depth of the pit. However, he added a margin of 3 meters.
Reply #32009-08-26
You should check whether there are any special requirements in the general layout. In terms of civil engineering, as long as your trench does not exceed the base of the sulfuric acid tank, there will be no structural safety issues.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.