HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking a renovation plan for the preheating coil in the methanol production plant using coke oven gas

2009-08-02View Original

Thread Content

Our facility produces methanol from coke oven gas, and the coiled tubes in the preheating furnace have deformed and sunk. I’m seeking help; anyone with a successful modification plan is kindly asked to share their insights. Thank you! ! ! ! ! !
Reply #22009-08-07
Similarly, in the first five sets of 100,000-ton units, both Sinopec and Black Cat experienced this issue with their preheating furnaces; switching to the box-type furnaces designed by Tianchen Design Institute can resolve this problem. However, the investment required is relatively high, around 7 million yuan. With this change, the need for fans is eliminated, resulting in more stable operation. Fengxi in Yongji, Shanxi can do it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.