HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

**The ‘Power Safety Work Procedures’ for power grids

2009-08-23View Original

Thread Content

**I can’t seem to find the ‘Power Safety Work Procedures’ for power grids; I hope everyone here can offer some guidance
Reply #22009-08-23
1# away1998 There’s also the “Safety Technical Regulations and Operating Procedures” – I’m really looking forward to it
Reply #32009-08-28
**There are the ‘Power Safety Work Procedures’ for power grids – I have the 05 version as well as the updated 08 version. I just can’t upload attachments; oh, please help me by giving more points, OP. Notice on the Issuance of the \"**Power Grid Company Power Safety Work Procedures (Electrical Parts of Substations and Power Plants, Power Line Parts) (Trial Version)\\" **Power Grid Safety Supervision [2005] No. 83 To all regional companies within the company’s system, provincial (autonomous region, municipal directly-administered area) power companies, and relevant directly affiliated units: In order to meet the requirements of advancements in power grid production technology and changes in management systems, as well as to strengthen safety management at power production sites, **Power Grid Company has formulated the \"**Power Grid Company Power Safety Work Procedures (Electrical Parts of Substations and Power Plants, Power Line Parts) (Trial Version)\\" based on the industry standards DL 408—1991 \"Power Industry Safety Work Procedures (Electrical Parts of Power Plants and Substations)\" and DL 409—1991 \"Power Industry Safety Work Procedures (Power Line Parts)\". These procedures are now being issued and will be put into trial use within the company’s system starting from March 1, 2005. If any issues arise during the trial period, please inform the Safety Inspection Department of the **Power Grid Company promptly. Appendices: 1. “**Power Grid Company’s Safety Procedures for Electrical Work (Electrical Parts of Substations and Power Plants)” 2. “**Power Grid Company’s Safety Procedures for Electrical Work (Power Line Parts)” “**Power Grid Company’s Safety Procedures for Electrical Work (Electrical Parts of Substations and Power Plants)” Table of Contents 1 General Provisions.................................................................1 2 Basic Requirements for Working on High-Voltage Equipment.....................3 2.1 General Safety Requirements..............................................................3 2.2 Inspection of High-Voltage Equipment..............................................4 2.3 Switching Operations..............................................................5 2.4 Working on High-Voltage Equipment..............................................9 3 Organizational Measures to Ensure Safety...........................................10 3.1 Organizational Measures for Safe Work on Electrical Equipment..............10 3.2 Work Order System...............................................................10 3.3 Work Permit System...............................................................16 3.4 Work Supervision System...............................................................16 3.5 Systems for Work Interruptions, Transfers, and Completion............17 4 Technical Measures to Ensure Safety..............................................19 4.1 Technical Measures for Safe Work on Electrical Equipment..............19 4.2 Power Outages.................................................................19 4.3 Voltage Testing.................................................................21 4.4 Grounding.................................................................21 4.5 Installing Signage and Fencing..............................................23 5 Safety Measures in Substations and Power Plants During Line Work......25 6 Live Work.................................................................26 6.1 General Provisions..............................................................26 6.2 General Safety and Technical Measures..............................28 6.3 Potential-Balancing Work..................................................29 6.4 Disconnecting and Connecting Conductors While Live..............31 6.5 Short-Circuiting Equipment While Live..............................33 6.6 Water Cleaning While Live................................................33 6.7 Mechanical Cleaning While Live..............................................35 6.8 Protection Against Induced Voltage.................................36 6.9 Work with Insulated Boom Trucks While Live......................36 6.10 Protective Gaps...........................................................37 6.11 Insulator Inspection While Live...........................................37 6.12 Low-Voltage Live Work......................................................38 6.13 Storage, Use, and Testing of Live-Work Tools......................39 7 Maintenance and Repair of Generators, Synchronous Condensers, and High-Voltage Motors...........................................42 8 Work on Sulfur Hexafluoride Electrical Equipment......................45 9 Work on De-energized Low-Voltage Distribution Devices and Wires......47 10 Work on Secondary Systems......................................................48 11 Electrical Testing..............................................................52 11.1 High-Voltage Testing......................................................52 11.2 Measurements Using Portable Instruments..............................54 11.3 Measurements Using Clamp Meters......................................54 11.4 Insulation Testing Using Megohmmeters..............................55 12 Work on Power Cables...........................................................56 12.1 Basic Requirements for Work on Power Cables......................56 12.2 Safety Measures During Power Cable Work..............................56 13 General Safety Measures......................................................59 Appendices.................................................................62 Appendix A: Format of Switching Operation Tickets for Substations (Power Plants)...........................................62 Appendix B: Format of Type 1 Work Tickets for Substations (Power Plants)...........................................63 Appendix C: Format of Type 1 Work Tickets for Power Cables...........................................................67 Appendix D: Format of Type 2 Work Tickets for Substations (Power Plants)...........................................72 Appendix E: Format of Type 2 Work Tickets for Power Cables...........................................................74 Appendix F: Format of Live-Work Work Tickets for Substations (Power Plants)...........................................76 Appendix G: Format of Emergency Repair Forms for Substations (Power Plants)...........................................78 Appendix H: Format of Safety Measures Tickets for Secondary System Work...........................................80 Appendix I: Styles of Signage...................................................81 Appendix J: Testing Items, Periods, and Requirements for Insulating Safety Tools...........................................83 Appendix K: Electrical Testing Standards for Insulated Boom Trucks Used in Live Work...................................87 Appendix L: Testing Standards for Climbing Tools...........................................90 Appendix M: First Aid Procedures...................................................91
Reply #42009-08-30
The original poster, please help and send me one. My email address is: QHLYLXJ@163.COM
Reply #52009-08-31
It has been sent to the email on the 4th floor; please check it.
Reply #62009-09-22
Please send me one from the original poster, to dblzy@126.com, so I can upload it to the forum.
Reply #72009-09-23
I want one too, email: iori010108@126.com. Thank you!
Reply #82009-10-09
I hope that senior can upload the compressed file to share it

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.