Thread Content
Zhuye's direct immersion system has been in operation for some time. I heard that the entire process has not been completed. I don't know what the production situation is and what other links affect normal production. I want to summarize the recent production. Please help! !
There is no specific information, but I heard that the effect is very bad! !
I have all the information, it’s mainly about the equipment.
Which equipment is the main problem? 3# Hold the wind and embrace the moon
There are some things that I am not comfortable revealing, hehe. . .
This post was last edited by wj24tm on 2009-9-24 10:35. The direct leaching conditions should be high pressure and high temperature and air (or oxygen). The equipment should have problems with high pressure, high temperature, anti-corrosion, etc.
Zhuye's normal pressure oxygen-enriched leaching is now basically normal. The material part: The main reason is that the construction unit made the wrong model when installing the pipe network and used ordinary pipes for the high-acid part. In addition, there are design flaws in the bottom flow part of the tank (actual with Zhuye). Now all have been rectified. The process is smooth and the material is discharged normally. The human part is OT metaphysics. The technical parameters are not adjusted according to the actual environment and materials.
It is estimated that your requirements are too high, and it is generally not convenient to disclose them. That would be a mistake. Especially when it is made public online.
Thanks for the reminder. 9# dalee
Some issues can be discussed with each other online. Under the principle of confidentiality.