HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

On the design of the inclined chutes for coke discharge from the coke tower in delayed coking units

2009-09-03View Original

Thread Content

Regarding the tilting chutes for discharging coke from the coke towers in delayed coking units, what design is used in each unit, what is the inclination angle, and are they made of cement-lined steel plates or steel chutes with spring supports? What are the advantages and disadvantages of each option?
Reply #22009-09-04
We have 27 degrees; it’s a steel chute with spring supports, and the steel plates often deform, so they need to be replaced.
Reply #32011-12-26
These days, they are generally made of concrete and steel structures, with shock-absorbing strips, and their performance is better than that of pure steel structures
Reply #42011-12-27
Concrete with steel structure and shock absorption, but the chute has fallen once – it’s too dangerous; now it’s being reinforced regularly

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.