DCS system bidding issues

2009-09-07View Original

Thread Content

Hello everyone! Who has prepared the DCS bidding documents? Can you share it? Sample essays are also available! thank you all
Reply #22009-09-07
The following is what I wrote before. It mainly requires you to explain the requirements in your technical specification, the parts that are prone to ambiguity, or the parts you want to modify. You don't want a technical specification, but you have to prepare it according to your own actual situation. --------------------------------------------------------------------------------------------------------------------------------- DCS Bidding Technical Description DCS system requirements are as follows: 1. The corresponding card spares for the 15% spare points must also be considered, and the supporting parts of the 10% spare card must also be spared accordingly. Alternate requirements: Calculate the 10% spare amount of the total I/O cards based on the actual number of points in the specification book. 2. For the redundant configuration required in the technical specifications (components related to the control loop such as AO cards, controllers, power supplies, communication buses, etc.), 1 must be done: 1 redundant configuration. AO cards controlled by separate processes do not need to be configured redundantly. 3. The participating control systems must meet the technical requirements in the DCS technical specifications, and each participating manufacturer should list them one by one in the corresponding technical specifications. 4. If there are any differences from the technical specifications, they must be clearly stated in the technical bid. 5. The technical bid requires that the software and hardware configured according to the technical specification should be clearly stated in a table, including the origin, specifications and models of the outsourced components. The spare part should also be clearly stated in a separate table. 6. The configuration of the alarm monitoring console must comply with the requirements in the technical specifications. The external dimensions must be consistent with the DCS console. The dimensions of the internal installation components of the console are provided separately. 7. When quoting, the DCS system including cards, power supply, operating console (enclosed), monitoring machine, software, connecting cables, terminal boards, relays, circuit breakers, HUB, card boxes, etc. shall be quoted separately. -----------------------------------------------------------------------------------------------------------------------

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.