Thread Content
I’ve clearly completed all the entries that were required, but it still shows “flowsheet not complete”. There’s also the message: “Main Process Flowsheet: Section GLOBAL: BLOCK not complete: BLKID = SEP. Required outlet port: L(OUT) does not have a stream connected”. Why is this? ? Could some expert please answer? Thank you so much! ! ! !
Is there no corresponding import logistics for logistics L?
The SEP module requires two outlet streams; did you miss one? ?
The SEP module is missing logistics; the poster should check it carefully
Required outlet port; please check, OP, to see if there’s a lack in the export logistics.
It is recommended to draw the logistics by starting from the red lines shown on the module (the logistics that must be connected) and extending them outward, in order to prevent those logistics from remaining unconnected to the module. You can click on the logistics item in the lower left corner to check whether a red line is displayed; if so, it means that the connection has not been established
Send the picture. It’s likely that a certain logistics component isn’t connected to the model.
It’s because your Process Flowsheet isn’t complete – there is no output Stream; please check carefully to see if the blocks aren’t connected properly. To ensure that data entry begins only when “Required Input Incomplete” is displayed in the lower right corner, it is essential to maintain a good habit.
There is a lack of logistics in the flowchart, or the logistics component isn’t connected to the relevant module; take a closer look!