HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

A brief discussion on the clinker crushing process; it’s strange indeed

2009-09-22View Original

Thread Content

After the clinker is crushed and transferred from the conveyor to the hopper, the material that has passed through the vibrating screen is then conveyed by a conveyor to another hopper at the same height. After it falls into the crusher, it is lifted again by a conveyor to the hopper and vibrating screen outside. Doesn’t this result in high energy consumption? Why not just place a crusher right in the room next to the vibrating screen in the yard? Is there something wrong with the design?
Reply #22009-09-22
Hehe, I think it’s reasonable. For materials that are a mixture of large and small pieces, screening is generally carried out first; this helps to reduce the amount that needs to be crushed, thereby lowering energy consumption (the energy required for crushing is much higher than that for screening). It also prevents the properly sized pieces from being over-crushed.
Reply #32009-09-22
Similar to the second floor, this approach increases the processing capacity of the circular vibrating screen; however, it allows some of the fine materials to be screened out first, thereby reducing the amount that needs to be processed by the crusher and cutting energy consumption
Reply #42009-09-22
2# Canoe: Yes, installing a vibrating screen in the crusher installation area to specifically sort the materials that have been crushed – isn’t that possible?
Reply #52010-01-07
But you can’t guarantee that the crusher will be able to crush to the required standard in one go.
Reply #62010-01-11
There might also be safety considerations at play. Since both are moving devices, could there be a risk of resonance if they are too close to each other?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.