HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Maintenance workshop personnel settings

2009-10-10View Original

Thread Content

How to set up maintenance workshop personnel for a 2500t/year polysilicon project?
Reply #22009-10-10
I don’t quite understand what it means. The division of labor is based on the nature of the work, which is mainly divided into instrumentation, electrical, and machine repair (including fitters, welders, etc.). According to the level, it is divided into managers, deputy managers, section leaders, and planners. Each team is assigned a squad leader, and the scheduling is assigned to the section leader. Production scheduling is uniformly distributed, and the squad leader is responsible for specific staff arrangements.
Reply #32009-10-10
This is not only related to the scale, but also the most important thing is related to the management level and the condition of the equipment. If there are frequent problems with the equipment and pipelines, there will be a lot of maintenance personnel.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.