HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is the project application report prepared by the owner themselves?

2009-10-16View Original

Thread Content

Is the project application report for submission to **approval or authorization prepared by the owner themselves, or is it commissioned to a design institute?
Reply #22009-10-16
It should be prepared by a design institute with consulting qualifications. Select the qualification level (Grade A, Grade B, Grade C) based on the project requirements.
Reply #32009-10-16
In accordance with the decision on reforming the investment system, projects that enterprises do not use for investment purposes will no longer be subject to approval; instead, they will be subject to verification and registration. Major approved projects and restricted projects require a project application report to be submitted to **.   The project application report must be prepared by a unit with engineering consulting qualifications; such units can be found on the China Engineering Consulting Network at www.cnaec.com.cn.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.