HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the pressure testing of oxygen pipelines

2009-10-19View Original

Thread Content

When pressurizing the oxygen pipeline, if no drain line is installed, water will accumulate at the lowest points after pressurization; these areas need to be cut open to drain the water before welding with TIG welding. Does this affect the safety of using the pipeline?
Reply #22009-10-19
There should be no impact, but if it is the final welding point of a pressure pipeline, flaw detection is required.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.