How to carry out the three checks and four confirmations as an operator before the project is handed over? ? ?
Reply #22009-10-20
The concept of \"three inspections and four determinations\" in engineering refers to: checking for omitted items in the design, examining the quality of the work and any potential risks, and verifying the amount of work that remains unfinished; thereafter, determining the tasks to be carried out, the persons responsible, the measures to be taken, and the deadline by which these issues must be resolved
Reply #32009-10-28
Check against the design drawings, list any unfinished tasks, missing items, quality issues, etc., address each one accordingly (following the principle of \"four fixations\"), and conduct inspections for each item.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.