HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to monitor coal yard inventories

2009-10-22View Original

Thread Content

How to control coal yard inventory, how to balance it, and how to supervise it
Reply #22009-10-23
Coal yard inventory supervision method! urgent need!
Reply #32009-10-23
Detailed coal yard management with one picture and three tables. Detailed provisions are made for coal stacking, coal storage, coal extraction, coal type distribution, burning progress, fire prevention and other contents.   The first picture is the distribution map of coal types in the coal yard. The centralized control duty officer is responsible for filling in and keeping the modified drawings. When stacking coal, the drawings must be filled in according to the progress of coal stacking in the coal yard. From the time when the coal pile starts to the time when the coal yard is full, the team on duty will fill in the coal pile date, and the operation specialist will conduct weekly inspections and verifications. The distribution map of coal types in the coal yard is kept from the time when coal is piled in a coal pile until all the coal piles are taken out.   The three tables are the coal yard timetable for coal types, the coal yard retrieval schedule, and the coal yard storage and burning table. The coal yard coal type schedule records the coal type and quantity of coal piled in each coal yard every day. It is used to check whether there are any omissions or errors in filling in the coal type distribution map of the coal yard, and to grasp the coal type, time and quantity of coal piled in each coal yard. After the coal pile is formed, the storage capacity of the coal pile is calculated. ; The stacking and retrieval schedule records the daily quantity of coal stacking and retrieval in each coal yard, which is used to control the daily and monthly coal stacking and retrieval quantity of the coal field, check whether the coal retrieval quantity has completed the planned coal burning progress of the coal field, check whether the coal piling quantity and coal retrieval quantity of each coal field are consistent, and calculate the actual coal storage quantity of each coal field at the end of the month. ; The coal storage and burning schedule records the starting time of each coal pile, the time when the pile is full, the amount of coal stored in the coal yard, the planned burning time and the daily coal withdrawal quantity, which is used to formulate the coal yard burning plan and control the coal yard burning progress.
Reply #42009-10-23
1. Get a drawing board in the workshop office, and let the coal yard dispatcher design the layout of the coal yard. 2. Requirements stated: Coal type, location, inventory quantity. 3. Real-time replacement every day.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.