HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

A CPP-based ethylene plant with an investment of 2.9 billion yuan and a production capacity of 500,000 tons has been put into operation in Shenyang

2009-10-22View Original

Thread Content

The ethylene production plant with an annual capacity of 500,000 tons, built through catalytic thermal cracking (CPP) and involving a total investment of 2.9 billion yuan, has been completed and put into operation at China BlueStar Shenyang Chemical Group. The commissioning of this 500,000 tons per year ethylene production facility using catalytic thermal cracking (CPP) technology not only marked the first breakthrough in ethylene production facilities in Shenyang City, but it also promoted technological advancement in China’s ethylene industry. It furthermore opened up a new pathway for ethylene production in China, one that features abundant raw materials and low costs.
Reply #22009-10-22
I was involved in the design of one of the key equipment, the PP fluidized bed reactor.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.