How many times should a hydraulic pressure test be conducted on the heat exchanger during maintenance?

2009-10-23View Original

Thread Content

What potential safety hazards arise from using only pipe management?
Reply #22009-10-23
Twice, usually once on the cooling medium side and once on the side being cooled
Reply #32009-10-23
1# liww8086, twice – you must be referring to a shell-and-tube heat exchanger; both the shell side and the tube side need to be pressurized tested
Reply #42009-10-23
First, test the shell side, then the tube side. When testing the shell side, it is also necessary to check the welds between the heat exchange tubes and the tube sheet; when only the tube side is pressurized with water, it becomes more difficult to inspect the welds between the heat exchange tubes and the tube sheet
Reply #52009-10-23
Only the tube side should be tested; it’s not possible to inspect the welds at the tube ends, so it’s best to conduct a hydrostatic test on the shell side

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.