Coke oven maintenance time

2009-10-24View Original

Thread Content

How to determine the maintenance time of coke oven?
Reply #22009-10-24
Turnaround time - (operating time
Reply #32009-10-24
Turnaround time - (operating time
Reply #42009-10-25
Why do some people say that the maintenance time cannot be less than 2 hours?
Reply #52009-10-25
Friends on the second and third floors, please don’t teach others that there is a problem with your maintenance time algorithm. Arrange the plan carefully. After segmenting, you should add the operating time in several segments. That is, if the maintenance is divided into two ends, you should add 20 minutes to the maintenance time.
Reply #62009-10-25
I don’t know how to arrange the two sections plus 20 minutes that my friend said. I will arrange a cycle plan. Please correct me. The turnaround time is 18 hours, 42 holes × 2, 9-2 sequence, 10 minutes of operation time 0: 00 1 0: 10 11 0: 20 21 ...... 6: 30 19 6: 40 29 6: 50 39 Maintenance time 9: 00 49 Same as below, furnace 42 is out for inspection, the inspection start time is 7: 00 is not 6: 50

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.