HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Gasifier heating time

2009-11-02View Original

Thread Content

I would like to ask the moderators: how long should it take to bake the gasifier’s refractory bricks after they have been installed, considering the climate in Inner Mongolia?
Reply #22009-11-02
Zhang? I’ve seen information saying 7 to 15 days
Reply #32009-11-02
By season, in summer, after building the furnace, let it air-dry naturally for a month before drying it in an oven; After building the furnace in winter, it should be dried as soon as possible. Start by drying it at a low temperature with strong airflow for 1–2 days, then increase the temperature according to the drying curve

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.