HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

New capacity regulations – Interconnected information

2009-11-04View Original

Thread Content

In the revised code, paragraph (2) of clause 1.11 states that “for the design and manufacture of pressure vessels……………………, the required data must be entered into the information management system for special equipment in a timely manner.” ” Appendix D of the new version of the tolerance specifications only lists the manufacturing numbers; it does not specify any requirements regarding the design. Also, where is the “Special Equipment Information Management System”? If anyone knows, please share the information!
Reply #22009-11-04
The special equipment dynamic supervision information platform that the authorities will provide in the future has not been released yet; it’s likely that it isn’t ready yet.
Reply #32009-11-04
Yes, for now only the tolerance specifications have been issued; many other requirements have not yet been established. Also, the original tolerance specifications specified that 100% radiography of the welded heads was required, but such a requirement can no longer be found in the current specifications. What percentage should be used for radiography then?
Reply #42009-11-04
Also, there are many changes to the quality certification documents as a result of this revision to the standards; quality plans and welding records are new requirements. I hope colleagues can discuss how to add them
Reply #52009-11-05
Most of the technical details are included in the referenced standards; regulations should have the appearance of proper regulations, without trying to cover everything and ending up in a messy mess. Head joint? Look for GB150.
Reply #62009-11-05
There is still a transition period before the new regulatory requirements come into effect on December 1st, so there’s no need to worry. During this transition period, everything will be improved; at present these are only theoretical requirements. For example, regarding the required risk assessments, no specific data tables have been established yet.
Reply #72009-11-05
The regulations regarding the inspection of head joints are now more clear. I don’t have the relevant book with me, so I can’t specify which rule it is, but the general idea is as follows: there are two methods for inspecting head joints. One involves conducting non-destructive testing before stamping, and another requires another inspection of the transition arc section after stamping. The second method is to conduct no inspections before stamping, and carry out comprehensive inspections after stamping. For the issue of the inspection ratio, it should be treated as Category A.
Reply #82009-11-06
Under Category A, it means that 100% testing is no longer required. If my equipment is used for partial flaw detection, then should I follow the criteria applicable to partial flaw detection? Pay attention!
Reply #92009-11-06
It should be this system, but it hasn’t been built yet. http://www.cnse.gov.cn/rzxk/login.php
Reply #102009-11-08
It is said that the authority has given a one-year transition period for the new regulations! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.