HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Water addition rate to the conversion and synthesis reactors for methanol production from coke oven gas (200,000 tons per year)

2009-11-06View Original

Thread Content

What is the typical water supply rate per hour for the conversion and synthesis reactors in a methanol production plant that uses coke oven gas (200,000 tons per year)?
Reply #22009-11-10
One ton of methanol produced generates one ton of steam, along with 30 tons of water per hour as waste water
Reply #32009-11-11
Hello HAIYOU on the second floor: Does the 30 t/n water replenishment amount you mentioned refer to the total amount of water needed to replenish both the waste boiler and the methanol waste boiler?
Reply #42009-11-11
3# xu*ngsheng27 Are you referring to transforming old boilers? I’m talking only about the water production volume from synthetic waste boilers
Reply #52010-09-06
The design data indicates a water supply rate of around 53 t/h for the converted drum boiler, and around 38 t/h for the synthetic drum boiler

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.