HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with the hydrostatic testing of the boiler system in hydrogen production plants

2009-11-14View Original

Thread Content

This post was last edited by Bohai on 2009-11-26 21:21. Does anyone have any information related to the hydraulic testing of boiler systems in hydrogen production plants that use natural gas as a raw material? What is the pressure for the hydrostatic test of the boiler system in a hydrogen production plant? Those who know, come and share!
Reply #22009-11-26
A few days have passed, and no hero has appeared yet! My own sofa! I hope someone who knows about this can tell me
Reply #32009-11-28
Then we need to consider the working pressure~ The pressure during the hydrostatic test is roughly 1.1 to 1.25 times the working pressure. .
Reply #42009-11-28
For new equipment, the design agency will provide a value, which is approximately 1.25 times the design pressure. Old equipment can be pressurized to 1.25 times the maximum operating pressure

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.