FOXBORO I\A`S Control System Emergency Plan

2009-11-14View Original

Thread Content

To avoid or minimize casualties and property losses resulting from failures in the automatic control systems, and to ensure a rapid response and proper handling in the event of abnormalities in the DCS system, this emergency plan has been formulated. I. Command Team: Team Leader: Deputy Team Leader: Members: II. Emergency Procedures and Plans for the Automatic Control System 1. Issues such as interruptions in bus communication: Emergency measure: Check whether the wiring is in good condition. Check the RJ45 connector for any damage, detachment, or looseness. If the connector is damaged, replace it immediately with a spare one or fabricate one on site; if it is loose, tighten it right away. After that, have an engineer check the network to ensure it is functioning properly and can operate normally. If the issue lies with the fiber optic transceiver or fiber optic patch panel, it can be reset by turning off the power and then turning it back on. 2. Controller or DNBT failure: Emergency procedure: Check whether the redundant controller is operating properly. If the main controller fails and the backup controller does not switch over correctly, immediately inform the relevant supervisors and request to manually switch the controller; press the reset button of the device to see if normal operation is restored. If startup fails, wait for an order to stop the equipment. Note: After resetting the DNBT, it is advisable to restart the workstation; however, if all three lights on the interface card are flashing normally, a restart may not be necessary. 3. Fault in the field bus module FBM: Emergency solution: Select the corresponding FBM on the CP PIO bus diagram, then choose the “EQUIP CHG” button to enter the operation screen for that FBM device. If the FBM is displayed in blue, select “GO ON-LINE”; if it is red, select “DOWNLOAD”. If the fault persists, check whether the identification code (LETTERBUG) of the FBM is loose – this may require using special pliers to remove and reinsert the code. After the system power is restored, it is possible that all FBMs under a particular CP will have their lights on; in such cases, select the FBM on the corresponding CP PIO bus, then choose “EQUIP CHG” and perform a “GENERAL DOWNLOAD”. 4. Peripherals failure at the workstation: Emergency measures: In the event of failures with printers, GCIOs, or alarm keyboards, check the connections first, and then reset the peripherals by turning off and on the power supply. After confirming a hardware failure, replace it immediately if spare parts are available. When installing the spare part, use a Letterbug Tool to replace the existing Letterbug. Once the indicator lights on the newly installed component turn on, the device name for that component should appear in white in the system management software, indicating that the spare part is working properly. If it is not displayed in white, repeat the above procedures for the CP, FBM, and interface components. When removing a station component, it is necessary to first loosen the “external device mounting screws” before unscrewing the fixing bolts. If the fault cannot be resolved after the above steps, preparations for shutting down the equipment should be made, and then Foxboro should be contacted. 5. Abnormal UPS power supply: Immediately contact the High-Voltage Operation Team 305 to check the UPS operation status, and inform the relevant supervisors while awaiting instructions.
Reply #22010-08-10
It would be even better if it could be optimized further
Reply #32010-08-14
Please organize it properly again, thank you
Reply #42010-08-14
FOXBORO has never said this officially, but I think it’s highly necessary to export the ICC configuration in text format as a way to manage the configuration. The smallest unit for backing up and restoring ICC data is a compound within a CP; if certain configurations are accidentally deleted, the usual approach is to manually add back the missing BLOCKs or restore the entire compound. Neither of these methods is very effective. By using iccprt to export the configurations of all the points, you can use iccdrvr.tsk to restore only the parts you need, without affecting the other components of that compound, and you can do so using the parameters from your last backup.
Reply #52014-04-05
:)Thank you, I’ve learned something new again

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.