Thread Content
Who has a load testing plan for the synthesis tower? Please share it. In my opinion, if the design capacity is 25 T/H, it is necessary to first stabilize the operation at a load of 20–22 T/H for 2–3 hours; if there are no issues, then the gas flow rate can be increased gradually. Careful operation is essential until the capacity approaches the designed value, in order to avoid various types of accidents.
Current design capabilities generally provide a considerable margin of safety, but when testing under load, as the original poster mentioned, careful and meticulous operations are required, along with the preparation of load-testing plans and safety protocols in advance.
I’m not sure whether the “ammonia synthesis tower load test” mentioned by the green moderator refers to a 72-hour operational assessment When conducting tests, it is crucial to be aware of the design capacity of the ammonia synthesis tower, and by examining the overall layout of the equipment used in the ammonia synthesis process as well as drawing on the operational experience of other units, to determine the maximum production capacity that can be achieved in actual operation. During the testing process, following the principle of progressing step by step, it is recommended to start with 70% load (70% of the design capacity) and run for at least one shift under each load level, before increasing the load by 5–10% at a time. After reaching the design load, it should operate for at least 72 hours, during which time various key operational parameters of the process should be collected in order to conduct a scientific assessment of the plant’s performance.