HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Precautions regarding the installation temperature of hyperbaric oxygen pipelines

2009-11-22View Original

Thread Content

This post was last edited by wwxxss_1 on 2009-11-22 at 17:04. What else needs to be installed when fitting a platinum resistor in a DN300 pipe at 8.5 MPa? Connector or blind tube? Please give your advice~
Reply #22009-11-22
The exterior is drilled using rods, while an armored thermal resistance wire is used on the interior; it is connected to the process pipelines via flanges. When selecting the material, it is important that it be at least the same as that of the process pipelines. Degreasing is the most crucial step before installation!
Reply #32009-11-22
It is best to install blind pipes and carry out degreasing treatment

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.