As craftsmen, what do you do during overhaul? How do you improve your level through overhaul? Everyone is welcome to discuss.
All the work was contracted out to others, and there was nothing wrong. I just went to the site to look around and asked others if I didn't know how to do it.
I want to post some photos of the overhaul, but I can’t upload them...
Overhaul, there are a lot of things to do. I don’t know what level the author is at, operator, technician, or? ? If you are an operator, the workshop should arrange corresponding work and learn from the technicians. * The work required for the next maintenance project, such as: Material statistics, replacement, purging, cleaning, how to overhaul, pressure test after maintenance, air tightness, these are all things that operators can do. Furthermore, we can analyze the reasons for the need for maintenance, whether it is the process itself, the operation, or the equipment. In fact, maintenance can do a lot of things. It’s hard to say here. What positions are busy and what are you busy with? You can send a message to chat alone.
I will have to wait a few more years before I have the opportunity to become a technician. I wonder if I will have the opportunity then? Oh, your suggestion is very good.
Overhaul, as a process technician, should do a good job. I think there are the following points:: 1. Participate in the formulation of maintenance projects, 2. Responsible for the formulation and implementation of overhaul and shutdown plans, 3. Responsible for the formulation and implementation of single maintenance plans, 4. Responsible for the supervision and inspection of protection against coal contact in use, 5. Others are personal learning. * and improved, such as understanding the internal structure of disassembled equipment, solving problems existing in equipment and processes during production, following up and investigating during overhauls, and on-site learning of modified equipment processes. * wait.
The best opportunity during overhaul is to study the drawings of the relevant equipment before opening the tower after safe handling.* , and then check the internal parts such as mass transfer and heat transfer in the tower, compare the drawings to see the system condition, or if there is an abnormality in the system operation, find the cause, make measures, perform maintenance, etc. during maintenance. The work is very hard, but you don’t see it every day.