HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking advice on Article 2.1, Paragraph 6 of the new regulations

2009-11-27View Original

Thread Content

Paragraph 6 of Article 2.1 of the new regulations requires that each steel plate intended for use in pressure vessels be accompanied by a quality certificate. Does this mean that a separate material quality record and a separate material usage record must be kept for each steel plate upon its arrival at the factory? As a result, the material inspectors will have an increased workload.
Reply #22009-11-27
It’s just copying and pasting – they find even that too much trouble; P
Reply #32009-11-27
That makes things more troublesome for the inspectors, as they have to go through way more documents to review: loveliness:
Reply #42009-11-27
That’s how it should be; each steel plate needs to have its own inventory number assigned

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.