HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems after the construction of self-leveling slabs...

2009-11-27View Original

Thread Content

I’m facing such a problem now: some time ago I built a self-leveling concrete workshop, which is enclosed. After a period of curing, when it was time to hand over the workshop, it was found that a section measuring 20*30 centimeters had not hardened. There are no problems elsewhere, including around this area. Everyone, **please help analyze what the reason is.** The construction temperature is around 10 degrees, with a humidity of 55%. The maintenance period is 15 days. No one entered during the maintenance period....
Reply #22009-11-28
Can the original poster be sure that this area, as well as other areas, were completed before any maintenance work was carried out?
Reply #32009-11-30
Yes, because this area is in the middle of a room.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.