What to do if there is a system-wide power outage and the forced circulation pump for converting waste heat is not starting?

2009-11-30View Original

Thread Content

Dear sea friends, our plant’s conversion boiler operates on forced circulation. The pump is also electrically driven; if there is a power outage throughout the plant, the backup generator cannot be started. So how should it be handled?
Reply #22010-07-25
This post was last edited by Yanglan Technology on 2010-7-25 09:40. This is a design flaw; in accordance with emergency handling principles, a generator set should have been installed during the design phase, so that it can start operating automatically in the event of a complete power outage, thereby ensuring the safety of the boiler. However, generator sets need to be regularly inspected and tested, but often the factory ignores them while there is power supply, only becoming concerned when a power outage occurs.
Reply #32010-07-25
What was said on the second floor is correct; this issue is a defect in both design and management.
Reply #42010-08-04
It is recommended to add another generator set; for example, our workshop is designed with one generator, and in the event of a power outage, it starts automatically within 15 seconds, so there is no need to worry about motorized equipment not being able to start. However, it is recommended that the generator be placed at a distance away from the workshop, maintaining the safety distance specified by the safety supervision agency.
Reply #52010-08-04
For the high-risk enterprises here, the Safety Supervision Bureau requires that dual power supply circuits be used, along with backup generator sets.
Reply #62010-08-05
The colleagues upstairs have misunderstood…… What others are talking about is how to handle accidents. In the event of the situation you mentioned, as an operator, the only thing you need to do is to initiate an emergency shutdown of the system, quickly cut off all materials flowing into it, and also avoid starting the venting process as much as possible, in order to prevent the heat from the furnace from entering the conversion reactor and causing the boiler water to evaporate

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.