HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with screw refrigerators

2009-12-06View Original

Thread Content

The process uses screw refrigerators with two-stage compression, and the refrigerant is R507. However, during operation, the low-pressure stage is always operating at full load, while the high-pressure stage fails to reach its full load capacity. Could everyone please analyze what’s going on here? Also, does anyone have the startup and shutdown procedures for the freezer? Please share them
Reply #22009-12-06
It is caused by a leak in the instrument solenoid valve or the sealing ring of the floating balance piston. The cause of this situation is usually dirty oil; check the refrigeration oil!
Reply #32009-12-06
There is a well-known chiller company in Dalian; you can search for it online – their brochure should be available there!
Reply #42009-12-06
It’s probably a problem with the spool; check the O-rings of the spool and see if there is any sticking

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.