HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Analyze the attachments to technical contracts for systems

2009-12-07View Original

Thread Content

What constraints should be imposed in technical contracts on the suppliers of the analysis cabin system (including gas chromatography, oxygen analyzer, and moisture meter), and what essential services must they provide? Could an experienced expert give some guidance? Thank you
Reply #22010-01-05
This post was last edited by qugd on 2010-1-5 09:31. Since it’s a business deal, it must be negotiated between the buyer and the seller. From the seller’s perspective, aside from the hardware such as instruments and equipment which must be provided, other resources such as human labor and materials are not necessary, including technical support and training, as users have varying levels of expertise and thus different requirements for services. The contents of a technical contract or technical annex must be negotiated between the buyer and the seller; it is difficult for others to provide you with accurate guidance on this matter. I spent many years selling field instruments and online analyzers; hardly two technical accessories are identical, as there are too many influencing factors such as process conditions, site conditions, user expertise, budget costs, scope of service, system configuration, and warranty period. Furthermore, the concept mentioned by the original poster regarding \"what constraints should be imposed on the supplier of the complete analysis cabin system (including gas chromatography, oxygen analyzer, and moisture meter) in a technical contract\" is incorrect. The terms of a contract are meant to bind both parties; focusing on constraints only on one party constitutes unfair terms that violate the principles of fairness and equity. It is also important to note that specific terms must be used in formal documents. Whether the seller can meet the requirements depends on the seller’s capabilities as well as the buyer’s standards, and it is also closely related to costs. If I were the seller, I would discuss and confirm each of the mandatory terms proposed by the buyer one by one. At the same time, I would also put forward some relevant mandatory terms for the buyer to meet the supplier’s requirements, because in this case the seller also wants to shift the risks to the buyer, since it is the buyer who is using such mandatory terms to shift their own risks.
Reply #32015-10-20
Where is the attachment? There, where?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.