Thread Content
Let’s talk about your team’s safety activities and safety studies.* How did it work? Do you have any good methods and experiences to introduce? Let’s share with each other.
Study before class* , learn after class * ; Everyone serves as a safety officer for a day ; 100-day safety competition, etc.
There are various forms of team safety activities, including special discussions, safety knowledge lectures, safety experience exchanges, on-site safety training, etc. Safety learning* It is also a form of safety activity. No matter what kind of activity is carried out, an activity plan must first be formulated before the activity is carried out, clarifying the activity date, activity theme, activity leader and participants, activity recorder, activity procedures and precautions, etc. In addition, it is emphasized that the content of the activity must be closely related to the actual work, must be targeted, and must have educational significance.
We usually combine it with before and after class, and go to school after class* Let’s take a look at the spirit of the document and the safety precautions. Others are not implemented very well!
Toolbox Safety Meetings Safety Special Discussions Safety Training and Testing Behavior Safety Observation Team Safety Inspections and Incident and Hazard Reports Employee Safety Leadership Improvement Plans and Actions
Before starting work every day, the team should insist on lining up in front of the class to give a safety speech. The team leader shall conduct "explanation, inspection, summary and evaluation" of all team members. Its main contents include: ①Check the mental state and physical condition of team members by checking their appearance. ②Check whether the clothing of team members and the wearing of labor protection equipment meet the standards. ③The content of the day’s work, work methods, work order, and division of work ; Explain each working group and what each person's tasks are. ④What unfavorable factors are prone to accidents in the content and parts of the day's work, what are the danger points, how to prevent them, how to implement the safety technical measures in the work instructions, etc. must be explained in detail. ⑤The construction technical requirements and safety technical requirements during construction operations must be explained clearly at the same time so that every operator has a clear understanding. ⑥Make a focused and concise summary of the safety construction and production situation of the previous day, praise good work and criticize poor work. ⑦If the safe construction production the day before was relatively good, team members should be reminded not to be arrogant and never relax their emphasis on safe work.
This activity is now held in our company through pre-shift meetings, which last about 40 minutes! But the company's vice presidents all went because we sent them emails to remind them, and then found someone to call them when team activities were held. Haha, this is the only way to do it!
Our company's team holds team meetings before and after the shift. Including the study of company rules and regulations and job operating procedures * , study of accident cases * , employee rewards and punishments, etc. At first, the vice president went to listen, but as time passed, the vice president stopped going and the team learned * Then it fell down and started to be based on form again. Everyone is busy handing over the class before and after class, and the team is learning * All that's left is to record. . . It is difficult to carry out grassroots safety team activities.
Conduct safety and fire drills once a month* , conduct safety lectures before class, etc. in various forms. The ultimate goal is to realize the concept of "I want to be safe."
The team safety activities include a safety talk before the class, a safety summary after the class, and a weekly safety study session.* ,The examination is supervised and recorded by the ,security department.
The company's Safety and Environmental Protection Department formulates monthly safety activity plans for each department and workshop, detailing the activity content and activity requirements. The specific time is determined by the department and workshop. The workshop team meets twice a month, and they all do it by themselves. The new company has just started, so it is a bit formal! In actual work, meetings before and after work and inspections during the class are done more seriously and well. Plans and records made to standardize individual doors.