There is no doubt that a fire permit must be issued to start a fire in a chemical enterprise. AQ30222008 also clarified three levels of fire regulations, namely application, fire, supervision and supervision, regional responsibility, and approval levels, etc. However, there is no explanation on how to issue this fire permit. I have come into contact with now: The person applying for a fire must go to the full-time safety officer of the company's safety management department to activate the fire certificate, and then the safety officer will find the relevant approver to sign. ; The person applying for a fire hazard should find the part-time safety officer in the workshop to start the fire permit, and the part-time safety officer should find the relevant approver to sign. ; There are three situations in which the person applying for a fire permit shall apply for a fire permit for his or her own team, and then find the relevant approver to sign. In accordance with the requirements of Articles 8.2.5, 8.3.2, and 8.3.3 of AQ30222008, special fires and first-level fires should be issued fire certificates by the safety department. ; For second-level fires, a fire certificate must be issued by the workshop ; The team cannot activate the fire permit. Although the fire permit issued by the team also requires relevant approval, more errors may occur.
Reply #22009-12-10
The requirements for fire in the chemical industry are very strict. First of all, take good fire measures: Treatment of fire areas, such as isolation, purging, gas detection, no flammable gas, and sealing of floor drains and trenches within 15 meters of the fire area ; Secondly. The project leader prepares the ticket, and the local security officer inspects the site and signs it after deeming it qualified. Finally, the unit leader signs (the director in charge of production). The safety management department does not issue fire tickets. They only play the role of inspection, guidance and supervision. ; All fire tickets shall be signed by the workshop technician with local management responsibility. If a risk assessment management system (rap) is used, tickets can be constructed and approved only through hierarchical authorization, which is very strict.
Reply #32009-12-10
This post was last edited by lyhh9024 on 2009-12-10 22:19 How to issue a fire permit, but there is no explanation? The following is just a reply to the poster regarding the issue of filling out the hot work permit in accordance with the relevant provisions of AQ3022-2008 "Safety Code for Hot Work in Chemical Production Units". 7.1 The person in charge of hot work 7.1.1 is responsible for applying for the "Operation Certificate" and has full responsibility for hot work. 7.5 Hot fire analyst The hot fire analyst is responsible for the hot fire analysis methods and analysis results. According to the requirements of the workshop where the fire point is located, go to the site for sampling and analysis, fill in the sampling time and analysis data on the "Work Certificate" and sign it. Words such as qualified may not be used in place of analytical data. 8.2.1 The applicant must fill in the items in the "Operation Certificate" item by item, and no blank items are allowed. ; According to the fire level, the approval authority specified in Article 8.3 shall be followed.
Reply #42009-12-11
Different companies may be a little different. Those with high risks must be stricter. Our company is relatively loose. For Category C and B, there is no difference in the level of fire license.
Reply #52009-12-11
First, implement safety measures. The person in charge of the territory is responsible for this work and signs the work permit for approval. Next, the person in charge of the maintenance unit will check whether the safety measures have been implemented and sign the work permit for approval. Only after the safety department signs and approves can hot work be carried out. Safety regulations for hot work in chemical plant areas must be followed.
Reply #62009-12-11
Fill in the fire certificate item by item according to the fire level and the corresponding fire certificate content, and seek approval from the relevant supervisor or regulatory department. Only after implementing various safety measures can you start a fire according to the procedures.
Reply #72009-12-11
The following contents can be filled in the fire certificate: personnel qualifications, hazard analysis, safety measures, supervision personnel, fire confirmation
Reply #82009-12-11
This post was last edited by lyhh9024 on 2009-12-11 16:59. The regulations on safe fire use in the main factory are for reference.: 12 Procedures for application for fire use and fire operation license 12.1 Application for fire use In principle, the use of fire is prohibited outside the hours specified for open fire operations, holidays and nights. If it is indeed urgently needed for production and infrastructure (except for third-level and fixed fire use), the fire use application procedure shall be handled according to the project management authority and after approval, the fire operation permit shall be applied for. 12.1.1 Applications for using fire outside the regulations for concentrated open flame operations and on holidays must be filled out by the construction unit and submitted to the company's safety leader for approval. 12.1.2 Applications for emergency repair of fire items outside of the regulations for concentrated open flame operations shall be filled in by the Operations Department (the Port Storage and Transportation Department shall refer to the implementation) and the "Fire Use Application Form" shall be reviewed by the leaders of the Operations Department and approved by the duty dispatch chief of the Production Department and above. 12.1.3 For applications for fire use during nighttime construction during continuous operations, the construction unit shall fill in the "Fire Use Application Form", which will be reviewed by the leader of the project department and approved by the leader of the operations department. 12.2 Procedures for applying for a fire operation permit 12.2.1 For fire operations above level 2 (including level 2), a fire operation permit must be obtained with the "Inspection and Maintenance Construction Work Ticket". 12.2.2 For special use of fire, the safety officer shall fill in the fire operation permit, which shall be reviewed by the head of the operations department, approved by the company’s safety department, and shall take effect after approval by the leader of the operations (professional) department. 12.2.3 For first-level fire use, the safety officer shall fill in the fire operation permit, which shall be approved by the company’s safety department after being reviewed by the head of the operations department and then take effect. 12.2.4 For secondary fire use, the safety officer is responsible for filling out the fire operation permit, which will take effect after approval by the head of the operations department. 12.2.5 The construction unit shall fill in a fire operation permit for Level 3 fire, and it shall take effect after approval by the person in charge of the unit where the construction area is located. The use of fire by units without regional jurisdiction shall take effect after approval by relevant personnel of the safety department. 12.2.6 When the safety officer is absent, the process and equipment technicians or relevant leaders have the right to fill in the fire operation permit. 12.2.7 Shutdown and maintenance equipment should avoid cross-operations as much as possible. When necessary, on the basis of hazard identification and risk assessment, the fire operation permit shall be reviewed by the supervisor of the operation area and issued uniformly by the deputy director in charge of production safety of the operation department and above. 12.2.8 For fixed fire use, the fire-using unit shall submit a written application and submit it to the fire brigade for approval. 12.2.8.1  When applying for a fixed fire for the first time, a floor plan of the fire point should be attached, clarifying the location, scope, type of fire and fire safety measures. A "Fixed Fire Point" signboard made by the fire brigade must be hung in a conspicuous place. 12.2.8.2  The fixed fire operation license of the construction unit shall be countersigned by the construction management unit of the company, and in principle, it shall not be issued for domestic fire use.
Reply #92009-12-11
“"To manage production, we must manage safety" and the principle of "whoever is in charge is responsible". A fire ticket should be issued by the department with jurisdiction over the equipment, and measures should be formulated and implemented. The security department can only check whether the measures are implemented and provide support for the security technology of the measures. Approval of whether fire is allowed. Since the safety department has no right to allocate personnel or production technology, how can it issue a fire ticket?
Reply #102009-12-11
Safety includes mechanical safety, equipment safety, production safety, electrical safety, etc. In terms of safety, it can include processes and equipment, and it is more professional, right?
Reply #112009-12-11
10# National Soul should check the production safety law and accident investigation procedures. Once an accident occurs, what responsibilities does the safety officer have?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.