Relief valve piping

2009-12-16View Original

Thread Content

This post was last edited by li*ch1968 on 2009-12-19 at 18:17. Should water inlet and outlet valves be used before and after the pressure relief valve? Is it necessary to install piping like a drain trap?
Reply #22009-12-19
A drain valve is generally installed in front of the pressure relief valve, and its piping is basically the same as that of a steam trap.
Reply #32011-10-17
Is there a lot of condensate in front of the pressure relief valve? There shouldn’t be much water there; why add a drain valve?
Reply #42011-11-24
It is recommended to install a steam-water separator and a drain valve in front of the pressure relief valve for water drainage. This is a piping configuration that our company recommends to our customers: http://www.qd-urayte.com/series2002 Piping diagram. gif
Reply #52011-12-29
Reply to 4# urayte: I have a question – what software did you use to create this image? ? ? ? ? ?
Reply #62011-12-31
It’s 4 stories tall – the manufacturer has advanced technology

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.