HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to connect the valve and pipeline of the cylinder outlet

2009-12-21View Original

Thread Content

How to connect the valve and pipeline at the outlet of the nitrogen cylinder? There seems to be no illustration in this regard. Friends, can you give me some advice?
Reply #22009-12-21
This post was last edited by arenemel on 2009-12-21 12:31 When the cylinder valve is exiting, connect the inner wire to the pressure gauge and pressure reducing valve (matched with the cylinder), connect the hose to its air source connector, and use iron wire. When tying the iron wire, use two-way tying. hehe! Observe the experience of on-site workers, haha! Sometimes specifications are just written things, and on-site construction is a different matter!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.