HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to conduct settlement measurements for a 145-meter chimney?

2009-12-21View Original

Thread Content

As per the title? What measurements are involved? How are they carried out? Please give some guidance! (It seems there’s no acceptance standard for 09!)
Reply #22010-05-09
This can be done by referring to the methods used for settlement monitoring and assessment in high-speed railways. Specifically, observation points should be placed symmetrically on the cylinder at a height of 0.5 meters above the ground level of the chimney (this is mainly for ease of measurement); if the foundation protrudes above the ground, observation points can also be set on the foundation. The elevation should be measured regularly, thereby allowing for the monitoring of both uneven settlement and average settlement

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.