Problems with the installation of instrument cables in workshops

2009-12-23View Original

Thread Content

My workshop has about 500 instruments with readings. When running cables from the DCS cabinet room to the field instruments, is it better to first run a 24-core bus cable to the field distribution box and then run 2-core cables from there to the field instruments, or is it better to directly run 2-core cables from the DCS cabinet room to the field instruments without using a distribution box? How is it arranged in the workshop now? Please help take a look.
Reply #22009-12-23
It is to run a 2-core cable directly from the DCS cabinet room to the field instruments
Reply #32009-12-24
First, determine the appropriate location for the distribution box based on the placement of the meters on site; then run a 24-core bus from the control room to the field distribution box, and subsequently run 2-core cables to each of the field meters. That’s the process.
Reply #42009-12-24
It is best to have an intermediate junction box (explosion-proof). In the event of suspicion of a cable short circuit or ground fault, the cables at both ends can be checked by using the intermediate junction box as a boundary. If a problem is found, a smaller amount of wiring can be used.
Reply #52009-12-24
In our workshop, we simply lay two-core cables directly at the site
Reply #62009-12-24
It is necessary to determine whether to install a junction box based on the distribution of workshop locations; if they are too scattered, there is no need to install one.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.