Thread Content
I graduated with a major in chemical engineering and have just entered this industry. The factory wants me to be the person responsible for inspection and hydraulic testing, but how to do it specifically? Have you ever done this?
learn first* Regarding the new content regulations and GB150, read the company's quality manual again, focusing on the hydraulic test part. The responsibilities of the person responsible for the hydraulic test are very clear. Each company will vary based on their specific circumstances.
Focus on the water pressure part. Does the inspection not matter? Also, according to the requirements of the new regulations, the quality certificate must also contain corresponding inspection records. So what should be done specifically? If you can help me, add me on qq: 634973586 Thank you!
The person in charge of the hydraulic test (actually the engineer responsible for the pressure test) is required by Document No. 194. According to the provisions of TSG Z0004-2007 "Basic Requirements for the Quality Assurance System for Special Equipment Manufacturing, Installation, Transformation and Maintenance", the pressure test is no longer listed separately and is merged into the inspection quality control system.; As a new employee, the company will ask you to take on the heavy responsibility of inspection. Isn’t it appropriate? Be careful and cautious. strengthen learning * .