The cold wave is arriving tomorrow, and the staff in charge of the control systems will have to stay on high alert again! During the last cold wave, the lowest temperature here was -10 degrees Celsius, and due to issues with utility services, there were two shutdowns. What about you?
Work stopped? Could it be that the cold prevented the watch from being detected in time? It hasn’t happened to us, but for things like voltage-controlled devices, flow meters, and level gauges, it’s important to pay attention; adjust them manually when necessary to ensure safety. Enhance inspections, compare primary and secondary meters promptly, use steam to warm areas prone to freezing, and install heat tracing in the coming year.
There are always some problems whenever a cold wave hits, but the shutdowns mentioned by the poster seem a bit excessive. Are the public services referred to by the poster affected by the wind? Is there a desiccant at the exit of the air compressor station? You can try adding more rows of condensers on the buffer tank of the air intake device
It’s -4 degrees here; fortunately, there haven’t been any major accidents. The problems are mainly leaks in the flanges and connectors, as well as malfunctioning instrument readings
Southern Refinery. The weather is still very hot, so there are no such problems; at worst, we just need to shut down a few air coolers. Hehe.
The lowest temperature here is 2°C, which is quite fine!
A few days ago, the lowest temperature here was -18 degrees. Thanks to the management in the workshop, who took thorough precautions against freezing and condensation before winter arrived, we haven’t encountered any major problems. Instrument malfunctions are common, but they don’t have any impact on production.
I think our management really needs to be improved.
Don’t worry about the steam – ensure proper heating and condensate drainage; guys on duty, get to work
The main issue here is with the instruments; they have stopped working
It was minus 10° here yesterday. But the device is fine. The unit now has a trace heater installed. Also, pay attention to the control of the control valve. On my end, I connect mixed steam near the control valves where problems are likely to occur, as a backup. Also, be careful to prevent freezing and condensation. There’s also the pump room; pay attention to dehydration