HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues with instrument and control system design?

2010-01-02View Original

Thread Content

Our factory is a chemical plant, and a second phase of construction is planned for next year. I was involved in the entire construction process as well as the technical upgrades for one of the projects. Recently, the manager asked me to prepare a design plan for the instrumentation and control systems in the second-phase workshop, based on the experience gained from the operation of the first phase. Could you please tell me how to approach this task and what the steps are? Thank you.
Reply #22010-01-03
Could all the sea friends help out? Thank you, it’s urgent
Reply #32010-01-03
There are also many types of chemical engineering, depending on which category you fall into. Generally speaking, you should first determine whether you will use centralized or decentralized control to manage it
Reply #42010-01-04
Send us the process design for Phase 2 so we can prepare a proposal for you. QQ: 709274284

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.