Vulnerable parts usage time statistics

2010-01-03View Original

Thread Content

Summary of service life statistics for wear-prone components
1# CO2 compressor
Service life of piston rings and support rings in stage 1: Manufacturer: Henan Bo’ai. Replacement date: December 11, 2008 → Inspection date: June 24, 2009 → December 25, 2009; total operating time: 3,026 hours → 3.2 months → 8,603 hours → 10.2 months → 10,970 hours.
Service life of piston rings and support rings in stages 4 and 5: Manufacturer: Yuanqu. Replacement date: January 4, 2009 → Inspection date: February 16, 2009 → December 25, 2009; total operating time: 3,392 hours → 1.3 months → 4,335 hours → 9.2 months → 10,970 hours.
Replacement dates of gas valves for stages 4 and 5: Manufacturers: Yuanqu, Henan Bo’ai, Shanghai Dalong (spare parts). Dates: January 14, 2009 → February 16, 2009 → February 18, 2009 → March 5, 2009 → April 8, 2009 → June 26, 2009 → August 16, 2009 → August 28, 2009 → October 24, 2009 → November 18, 2009 → December 25, 2009.

2# CO2 compressor
Service life of piston rings and support rings in stage 1: Manufacturer: Henan Bo’ai. Replacement date: November 14, 2008 → Inspection date: April 13, 2009 → December 25, 2009; total operating time: 3,878 hours → 6.5 months → 8,566 hours.
Service life of piston rings and support rings in stages 4 and 5: Manufacturer: Wenzhou. Replacement date: February 17, 2009 → Inspection date: May 26, 2009 → December 25, 2009; total operating time: 6,411 hours → 1 month → 7,166 hours → 2 months → 8,566 hours.
Replacement dates of gas valves for stages 4 and 5: Manufacturers: Yuanqu, Henan Bo’ai, Shanghai Dalong (spare parts). Dates: February 8, 2009 → February 9, 2009 → February 14, 2009 → February 14, 2009 → April 21, 2009 → May 10, 2009 → May 26, 2009 → September 30, 2009 → October 15, 2009 → November 9, 2009 → December 25, 2009. On May 27, 2009, the cylinder liner for stage 5 was replaced.

3# CO2 compressor
Service life of piston rings and support rings in stage 1: Manufacturer: Henan Bo’ai. Replacement dates: July 15, 2008 → May 10, 2009 (replaced by Wenzhou-made parts) → December 15, 2009 (replaced again by Henan Bo’ai-made parts); total operating time: 2,948 hours → 5.7 months → 7,075 hours → 3.2 months → 9,418 hours.
Service life of piston rings and support rings in stages 4 and 5: Manufacturer: Yuanqu. Replacement dates: October 2, 2008 → March 5, 2009 (inspection) → April 27, 2009 (replacement); total operating time as of December 25, 2009: 4,200 hours → 3.2 months → 6,548 hours → 3.5 months → 6,813 hours → 3.7 months → 9,529 hours.
Replacement dates of gas valves for stages 4 and 5: Manufacturers: Yuanqu, Henan Bo’ai, Shanghai Dalong (spare parts). Dates: March 5, 2009 → April 3, 2009 → April 9, 2009 → April 20, 2009 → July 6, 2009 → August 28, 2009 → September 16, 2009 → October 14, 2009 → November 3, 2009. On April 27, 2009, the cylinder liner for stage 5 was replaced.

1# Ammonia pump
Dates of packing replacements: Henan Bo’ai. Middle cylinder: January 10, 2009 → North cylinder: February 21, 2009 → Both middle and north cylinders: May 7, 2009; total operating time: 5,329 hours → 1.8 months → 5,966 hours → 1 month → 6,753 hours → 2.5 months → November 3, 2009 (three sets of packing replaced) → December 25, 2009; total operating time: 8,578 hours → 0.3 months → 8,849 hours.

2# Ammonia pump
Dates of packing replacements: Henan Bo’ai. North cylinder: January 12, 2009 → Middle cylinder: February 21, 2009 → Both middle and north cylinders: May 2, 2009; total operating time: 4,475 hours → 1.2 months → 4,512 hours → 1.1 months → 5,324 hours → 6.3 months → December 10, 2009 (three sets of packing replaced) → December 25, 2009; total operating time: 9,881 hours → 0.3 months → 10,119 hours.

3# Ammonia pump
Dates of packing replacements: Henan Bo’ai. Three sets of packing replaced on January 12, 2009 → June 29, 2009; total operating time: 6,137 hours → 3.2 months → 8,435 hours → 2.4 months → 10,182 hours. On June 29, 2009, clearances between main shaft bearings were measured: 0.28 mm for south bearing, 0.24 mm for middle bearing, and 0.26 mm for north bearing.

1# Methylamine pump
Dates of packing replacements: Henan Bo’ai. Middle and north cylinders: January 30, 2009 → South cylinder: April 8, 2009 → Three sets of packing replaced on June 12, 2009; total operating time: 5,094 hours → 2.8 months → 7,023 hours → 0.2 months → 7,192 hours → 3 months → October 2, 2009 (three sets of packing replaced) → December 25, 2009; total operating time: 9,354 hours → 1.6 months → 10,507 hours. On November 3, 2008, the combined valve from Xi’an was installed; it has been in operation ever since, with a cumulative operating time of 8 months.

2# Methylamine pump
Dates of packing replacements: Henan Bo’ai, Shanghai High-Pressure Valve Factory. Middle cylinder: November 3, 2008 → South cylinder: April 17, 2009 → Three sets of packing replaced on June 16, 2009; total operating time: 4,027 hours → 2.7 months → 5,044 hours → 1.3 months → 6,017 hours → 3.5 months → August 20, 2009 (middle cylinder replaced) → September 11, 2009 (north cylinder replaced) → October 2, 2009 (three sets of packing replaced by Shanghai High-Pressure Valve Factory); total operating time: 8,591 hours → 4 months → 8,950 hours → 2.3 months → 10,651 hours.

3# Methylamine pump
Dates of packing replacements: Henan Bo’ai. Middle and north cylinders: January 28, 2009 → Three sets of packing replaced on September 13, 2009 → December 20, 2009; total operating time: 5,494 hours → 4.8 months → 8,976 hours → 0.8 months → 9,586 hours. Mechanical seal of the reflux pump was replaced; 1# 2008.11.16—→2009.12.29—→2009.5.20—→2009.8.12—→2009.9.27—→2009.10.13—→2009.12.16—→2009.12.11 2# 2008.12.5—→2009.8.11—→2009.9.2—→2009.11.15 Replace the seal of the boiler feed pump ; 1# 2008.11.25—→2009.5.22—→2009.8.6—→2009.11.8
Reply #22010-01-04
This year, I also plan to conduct assessments on the service life of components in my company, in order to draw the workshop’s attention to the quality of these components and the level of maintenance work. However, the service life of components is indeed related to many factors; as the original poster mentioned, even with the same type of machine and from the same manufacturer, there can still be significant differences in service life. Do you have any analytical reports on this topic? I think that since statistics are being collected, it would be best to carry out further analysis to guide future work.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.