HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

LNG storage tank purging design

2010-01-04View Original

Thread Content

May I ask, what are the special regulations for purging the annular space and bottom of LNG storage tanks? What is the general purge time and what is the design purge gas speed? Thank you
Reply #22010-01-04
I want to know too! Thank you to those who contributed selflessly!
Reply #32010-01-04
The interlayer and bottom purge is not a time limit, it is a dew point detection of the exhaust gas. It only needs to be qualified for a continuous period of time. We had a gas flow requirement during the initial purge.
Reply #42010-01-05
3# lsm224 Hello, can you tell us specifically your time requirements and your storage tank capacity? Can you elaborate on the gas velocity regulations for interlayer and bottom purge? Thank you in advance
Reply #52010-01-05
It seems simple, but it really requires some practical experience.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.