HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How long does it take to assemble a 400-ton crawler crane?

2010-01-13View Original

Thread Content

For the lifting equipment we need on-site, a 400-ton crawler crane is required; all crawler cranes are assembled on site. So, how long does it take to assemble a 400-ton crane?
Reply #22010-01-13
It depends on how high your boom assembly is; generally, it takes 5-7 days
Reply #32010-01-13
The pole is over 80 meters long, and a lifting counterweight is also installed
Reply #42010-01-13
At my previous workplace, with a boom length of 53 meters, the assembly time was 3 days, while with a boom length of 78 meters, it was 4 days. The above is the net alignment time after all components have arrived.
Reply #52010-01-14
The poster is referring to the assembly after the crane delivers it to the site; generally, it takes 4 days to assemble the entire unit. It mainly depends on the skill level of the crane operator, as well as the boom and jacking weights; the minimum time required is 7 days.
Reply #62010-01-20
It was originally used at Shougang; generally, it takes three days!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.