HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The issue of the installation sequence for check valves and steam traps

2010-01-13View Original

Thread Content

A steam trap and a check valve are installed on the medium-pressure steam pipeline. In what order should they be installed – the steam trap first and then the check valve, or the check valve first and then the steam trap? What is the reason for this? There is a standard for this installation; could an expert give some guidance? Thank you
Reply #22010-01-14
First, install the steam trap, and then install the check valve; the check valve prevents water in the condensate collection pipe from flowing back into the steam trap pipeline due to excessive pressure.
Reply #32010-01-14
Agree with the second-floor view. :victory::victory::victory:

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.